Use this template for tracking acceptance risks that remain open during SAT, commissioning, and handover. It is intended for BESS project teams that need a concise, reviewable artifact during commissioning, acceptance, or handover.
| Review Area | Prompt | Evidence Or Owner |
|---|---|---|
| Scope | Which site, enclosure, subsystem, or work package is covered? | State the boundary and owner before review. |
| Inputs | Which drawings, test records, logs, or supplier documents are required? | Link document IDs or storage locations. |
| Readiness | What must be true before this item can be marked ready? | Define pass criteria and required signoff. |
| Exceptions | Which open items can be deferred without blocking acceptance? | Record rationale, risk, and accountable owner. |
| Handover | What should operations receive after closeout? | Capture final record, date, and receiving role. |