Native source materials / 29 indexed

Native lessons and source materials

This index links to repository-authored course records, examples, tutorials, and technical reading. The separate browser lab is an educational surrogate; its sliders and checkpoints do not execute this repository's native engine.

Current audited native source: 92a0b4ea1d5c4c30bbc7869f7914751c1e96a0ac

Conceptual teaching diagram selected from the repository visual mapping
Reduced-order conceptual inverter path; not a validated hardware or grid-code design.

Browser-lab provenance from the reconciled package: package source revision 24de0b792ecb4357b42be5bbe20183c1112b5702. This is separate from the current native source revision above.

Section 03: Reproduce / parameters

Source-defined reproduction commands

These exact one-line commands were observed in the audited repository workflow records and link to their source location. Expected setup, tool licensing, data, and environment vary by repository; the dashboard does not execute these commands or promise a completion time.

Search the native catalog

29 materials

Read the machine-readable native catalog

Section 01: Question / topology

Question / topology

Native reading

Inverter Mode Transition Checklist

Use this checklist to review transitions between grid-following, grid-forming, standby, and fault states.

checklists/inverter-mode-transition-checklist.md

native reading
Native reading

Weak-Grid Storage Review Checklist

Use this checklist when a BESS dispatch plan must operate in a weak-grid, constrained-grid, islanded, or low-short-circuit-strength context.

checklists/weak-grid-storage-review-checklist.md

native reading
Section 02: Equations / provenance

Equations / provenance

Native reading

Active Reactive Power Priority

Use this page for explaining how active and reactive power commands should be

concepts/active-reactive-power-priority.md

model reproduction
Native reading

Grid-Forming vs Grid-Following Storage

Battery energy storage systems can support the grid in different control modes. This note gives a compact distinction for project discussions.

concepts/grid-forming-vs-grid-following.md

model
Native reading

Storage Dispatch Basics

Storage dispatch is the decision process for when a battery energy storage system charges, discharges, holds reserve, or stays idle.

concepts/storage-dispatch-basics.md

model
Section 03: Reproduce / parameters

Reproduce / parameters

Native reading

Active/Reactive Capability Reference

This dependency-free Python example makes constrained active/reactive power

models/README.md

model native lesson
Section 04: Verification / output

Verification / output

Native reading

Grid Support Service Comparison

Battery storage can support the grid through several services. Use this comparison to align the service name, control question, and evidence request before making performance claims.

concepts/grid-support-service-comparison.md

verification
Native reading

Grid-Code Evidence Prompt

Use this prompt to structure early BESS grid-code review discussions. It is jurisdiction-neutral and should be adapted to the applicable connection agreement, utility requirement, or grid-code document.

concepts/grid-code-evidence-prompt.md

verification
Section 05: Scope / limitations

Scope / limitations

Native reading

Availability Performance Template

Use this page for capturing storage availability assumptions, exclusions, and supporting event evidence. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/availability-performance-template.md

scope verification
Native reading

Black Start Readiness Prompts

Use this page for framing evidence questions for storage-supported restoration and black-start discussions. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/black-start-readiness-prompts.md

scope verification
Native reading

Congestion Relief Dispatch Note

Use this page for describing how storage dispatch assumptions support congestion relief claims. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/congestion-relief-dispatch-note.md

scope verification
Native reading

Event Log Review Guide

Use this page for reviewing storage controller and inverter event logs after grid-service tests. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/event-log-review-guide.md

scope verification
Native reading

Grid Code Traceability Matrix

Use this page for linking grid-code clauses to evidence, owners, and unresolved questions. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/grid-code-traceability-matrix.md

scope verification
Native reading

Grid Forming Test Scenario Log

Use this page for tracking grid-forming test cases, pass criteria, and missing evidence. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/grid-forming-test-scenario-log.md

scope verification
Native reading

Grid Service Evidence Checklist

Use this checklist to confirm that each proposed grid service has traceable settings, tests, and operating limits.

checklists/grid-service-evidence-checklist.md

scope verification
Native reading

Harmonic Performance Evidence

Use this page for framing the evidence needed for harmonic performance and power quality review. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/harmonic-performance-evidence.md

model scope verification
Native reading

Interconnection Review Questions

Use this page for turning grid interconnection requirements into reviewable engineering questions. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/interconnection-review-questions.md

scope verification
Native reading

Islanding Risk Review Checklist

Use this page for reviewing islanding risks, controls, protections, and operator actions for storage systems. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

checklists/islanding-risk-review-checklist.md

scope verification
Native reading

Market Service Assumption Register

Use this page for separating market-service assumptions from technical grid-service evidence. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/market-service-assumption-register.md

scope verification
Native reading

Microgrid Mode Transition Log

Use this page for tracking mode transitions between grid-connected, islanded, and recovery operation. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/microgrid-mode-transition-log.md

scope verification
Native reading

Operator Control Room Handover

Use this page for clarifying the monitoring, alarm, dispatch, and escalation details operators need. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/operator-control-room-handover.md

scope verification
Native reading

Playbook Next Research Questions

Use this page for capturing unanswered smart-grid storage questions for future source-backed expansion. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/playbook-next-research-questions.md

scope verification
Native reading

Protection Coordination Review

Use this page for reviewing protection assumptions that affect storage interconnection and operating modes. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

checklists/protection-coordination-review.md

scope verification
Native reading

Renewable Smoothing Case Note

Use this page for documenting dispatch assumptions for using storage to smooth renewable generation ramps. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/renewable-smoothing-case-note.md

scope verification
Native reading

Resilience Use Case Template

Use this page for defining the load, outage, SOC, and recovery assumptions behind resilience claims. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/resilience-use-case-template.md

scope verification
Native reading

Service Stacking Conflict Log

Use this page for recording conflicts when multiple grid services compete for storage capability. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/service-stacking-conflict-log.md

scope verification
Native reading

Storage Dispatch Priority Matrix

Use this page for ordering control objectives when storage services compete for the same power or energy headroom. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/storage-dispatch-priority-matrix.md

model scope verification
Native reading

System Operator Query Log

Use this page for tracking questions from system operators and the evidence used to answer them. It keeps smart-grid storage discussions tied to service intent, control behavior, evidence, and operating limits.

concepts/system-operator-query-log.md

scope verification