BESS Closeout Review Checklist

Use this checklist before commissioning handover, commercial operation, or final closeout review. It ties together evidence quality, residual risk, punch-list status, and the handover document package.

Review Area Pass / Fail Check Evidence Link Owner Status Notes
Evidence completeness Every required commissioning item is mapped in the commissioning evidence matrix. Evidence matrix / closeout folder Commissioning manager Not started Confirm missing evidence has an owner and due date.
Evidence wording Acceptance statements follow the acceptance evidence wording guide. Test records / screenshots / certificates QA/QC lead Not started Avoid vague wording such as “checked” or “received.”
Open punch-list items All punch-list and nonconformance items are closed or explicitly deferred in the punch-list tracker. Punch-list export Project controls Not started Separate open work from accepted residual risk.
Residual risk Deferred items are approved in the residual-risk acceptance template. Residual-risk register Owner representative Not started Confirm interim controls and target close dates.
Handover package Required drawings, procedures, certificates, and test records are listed in the handover document index. Document index Document control Not started Confirm revision and approval status.
Operations readiness Operators have received procedures, alarm/trip summary, and known-residual-risk notes. Training record / handover notes Operations lead Not started Confirm operational restrictions are visible.
Final approval Closeout package has required owner, EPC, commissioning, and operations sign-offs. Approval record Project manager Not started Record any conditional acceptance language.

Reviewer Prompts